FlowLine Fitted Bathroom Furniture by Aqua Elegance
Discover the FlowLine range — a premium collection of 100% waterproof fitted bathroom furniture by Aqua Elegance. Engineered from high-performance expanded PVC with a luxury polyurethane (PU) surface finish, every piece in the FlowLine range is completely immune to the moisture, steam, and condensation that destroys traditional timber or MDF bathroom furniture.
Available in three sophisticated finishes — Creamy White, Light Grey, and Oak — the FlowLine range allows you to create a cohesive, bespoke fitted look throughout your bathroom. Mix and match units to suit your space and storage needs.
The FlowLine Range
- FlowLine 300mm Base Unit — compact fitted base storage
- FlowLine 500mm Base Unit — standard fitted base storage
- FlowLine 300mm Tall Storage Unit — full-height fitted storage tower
- FlowLine 500mm WC Unit — concealed cistern WC housing
- FlowLine Combination A — pre-configured fitted furniture combination
- FlowLine Combination B — pre-configured fitted furniture combination
Why Choose FlowLine?
- 100% Waterproof PVC Construction — won't warp, swell, or deteriorate in high-moisture environments
- True Fitted Furniture Aesthetic — at a competitive price point
- Coordinated Range — mix and match units for a bespoke fitted look
- 3 Contemporary Finishes — Creamy White, Light Grey, and Oak
- Superior Durability — vs traditional MDF or timber alternatives
- Low Maintenance — easy to clean, moisture-resistant surface
Technical Specification
- Core material: Expanded PVC (100% waterproof)
- Surface finish: Luxury polyurethane (PU)
- Available finishes: Creamy White / Light Grey / Oak
- Country of Origin: China
Frequently Asked Questions
What does waterproof PVC construction mean?
The FlowLine range is built on an expanded PVC (polyvinyl chloride) core, which is inherently waterproof. Unlike standard MDF or timber bathroom furniture that can swell and deteriorate in humid conditions, the PVC core will not warp, swell, or degrade. The luxury PU (polyurethane) surface finish adds a premium, tactile quality that is easy to clean and moisture-resistant.
Can I mix and match FlowLine units?
Yes — all FlowLine units are designed to work together as a coordinated fitted range. You can combine base units, tall storage units, and WC units in any configuration to suit your bathroom layout and storage needs. Pre-configured combinations are also available.
Can I order if the item shows as out of stock?
Yes — we accept orders even when stock shows as zero. Items are dispatched as soon as stock is replenished. Contact us at customerservice@bubblegumbathrooms.co.uk or call 01603 381095 if you need a lead time estimate.